Skip to content
Snippets Groups Projects

GitLab 9.3 release post

Merged Victor Wu requested to merge release-9-3 into master
All threads resolved!
1 file
+ 4
0
Compare changes
  • Side-by-side
  • Inline
@@ -428,6 +428,10 @@ copyedit and check for grammar, spelling, and typos.
Please follow the checklist in the MR description to
guide you through the review.
Lastly, on the 2nd day before the 22nd (or as soon as the content is ready),
the post should be reviewed by a Marketing team member (PMM, CMM)
to evaluate wording and messaging.
#### Structural Check
Once the post is filled with content, the technical writing,
Loading